17 of ~81 facilities (NA scope)623 dock doors1,087 trailer spots4 rail-served
We core-sampled 17 of ~81 plants and DCs, Mondelez's FY2025 10-K reports 81 North America facilities (20 manufacturing plus 61 distribution and warehouse), of which we audited 17.
Network size: https://www.sec.gov/Archives/edgar/data/1103982/000162828026005345/mdlz-20251231.htm (2026-02)
Public audit. Not affiliated with Mondelez International. Data from satellite imagery + public records.
Click any site for its gate, docks, and drop yards. No badge, no NDA, just what a driver sees.
Your TMS runs the road. Your WMS runs the building. The yards are the tier between them, and they were never on the network.
Every truck gets re-keyed, re-queued, and re-found at each step. The lost time lives between the steps, which is why no single tool ever fixed it. The audit below is that gap, measured on your real yards.
A real audited site, played gate→dock→exit on the true yard geometry. Switch sites with the picker.
Driver rolls past the gate, looks for instructions on where to drop.
Movement durations are honest floors set by yard geometry; the uplift lands on the wait fields (queue + dispatch + secondary checkpoints). “Today” timings reflect the radios-and-clipboards world; “With YardFlow” reflects the protocol acting end-to-end. We may be wrong about parts of this, your actual numbers will tell us where.
Read from satellite + Street View across all 17 facilities. At a comparable network, Primo Brands cut drop-and-hook turns from ~48 to ~24 min. Set your real volumes and margins in the calculator to put a number on it.
Three patterns held across the sites we sampled. None of them show up on a facility list. All of them change how the yard runs.
Fort Worth DC runs 115 dock doors. That's 14 trucks staged per minute at peak.
4 of 17 audited sites are rail-served. Outbound truckload still dominates inbound rail.
Nabisco Chicago Bakery is 100 acres of vertical CPG manufacturing. Different yard problem than a DC.
This audit is the evidence. The model is the math. Open the calculator seeded with Mondelez International’s audited yards, set your real volumes and margins, and it sizes the opportunity to the dollar.
This deep-dive is the evidence behind the /for/mondelez-international memo.
Tell us where we got it wrong, or see what 15 minutes of orchestration looks like on your worst site.
A 30-minute call, direct with Casey. We show you what we found across your yards, you tell us straight where it fits and where it does not. If the call goes well, we talk pilot. If not, you keep the analysis.
None of these times work? Email me at casey@freightroll.com or call or text me at 410-236-7434, and we’ll find one.
Casey Larkin, YardFlow. Jake, our founder, joins when it helps.